项目时间:2014-09 - 2014-12
项目名称:APA & MRC Aus
项目描述:
项目介绍
1.Arrange work schedule as per customer's requirements;
2.Review mill's certificates and quality system management documents;
3.Review equipment valid certificates and calibration certificates of gauges;
4.Review qualifications of personnel;
5.Witness material's test, and Lab test
6.Witnessed repair area for external coating and internal coating
7. Coating of Pipe for 1067X12.27mm external FPE coating and internal painting.
External FBE coating,
8.Arrange work schedule as per customer's requirements;
9.Review mill's certificates and quality system management documents;
10.Review equipment valid certificates and calibration certificates of gauges;
11.Review qualifications of personnel;
12.Witness material's test, and Lab test.
13.Witnessed repair area for external coating and internal coating.
14.Witness truck loading, supervision, control and report of production process;
15.Review MTC and sign;
16.Issue the release note;
17.Write the daily report and Weekly report.
18.Inspection during the coating process and reviewed part records, test reports of coating production, including raw material confirmed, incoming rack inspection, the abrasive blasting, Dust test , Surface cleanliness, Surface profile ,control record of coating Environmental conditions, interval time of blasting and coating , Intermediate frequency heating and powder spray, water cooling, Coating appearance, on line and manual holiday detection test, External FBE thickness of coating, cutback pipe end record of coating, Packing etc.,
19.Witnessed lab test including after 24hours Catholic Disbandment test and hot water soak, Flexibility test, Interface contamination test, Interfacial Porosity test, Cross-section Porosity test.
我的职责
项目时间:2015-12 - 2016-12
项目名称:Apple Mac Pro track pad
项目描述:
项目介绍
为苹果提供最新笔记本电脑的Track pad
我的职责
开发期间负责内部,供应商,客户之前的沟通。
统一测量方法,讨论相应的标准,并逐步完善来料检验标准。.
量产后负责处理来料和产线的来料异常,推进供应商持续改善。
项目时间:2012-11 - 2013-05
项目名称:天合汽车 转向器 GAC43 个 GAC44
项目描述:
项目介绍
在南通供应商进行FIAT转向器的质量改善与新模具的开发。
在新模具开发中,主要注重于减少铝压铸件在几个主要的密封面处出现大量气孔的问题与供应商有效的沟通采取的措施,以及完成的时间。
产品的合格率从20%提高到了75%。
供应商的供货能力持续提高,供货量从200件每天,提高到400件每天。
我的职责
南通供应商的日常过程审核。
产品的日常发货与生产。
供应商安全库存的建立。
新模具的开发与PPAP阶段与供应商的沟通。
PPAP文件,FMEA,MSA,CPK,全尺寸报告的审核。
项目时间:2014-09 - 2016-03
项目名称:红米手机
项目描述:
项目介绍
与机电.TP团队共同管理红米NOTE系列等案子,定期与供应商确认来料累退不良品,并签订VDCS,降低了不良品的库存金额。
及时将来料检验时发现的不良信息反馈给供应商,并督促供应商给出临时及长期的改善方案,且实时跟进改善进程,将物料来料批退率控制在1.5%以下。
定期與供應商確認產線累退不良品,并及時簽核VDCS,求偿VDCS結案率100% 。
及時將生產線和客戶端發現的来料不良信息反饋給供應商,并督促供应商给出解决对策,且跟进改善物料上线的使用情况,Issue結案率100%
及時有效的向供應商反饋其產品在生產及客戶端出現的各種不良項目,要求供應商在收到反饋的三個工作日內給予8D報告,提供改善物料到料日期,并跟进改善料的检验及上线情况,上线物料不良率控制在0.12%以下,提高了制程良率。
我的职责
2014至今参与小米手机-红米系列相关进料品质提升工作