项目时间:2016-01 - 2017-04
项目名称:导入驱动IC量产
项目描述:
项目介绍
制程优化和机台改造完毕
driver IC成功量产.目前可以量产切割60um.38nm FAB wafer.
目前一线面板厂已经在我厂量产
我的职责
专案负责人
项目时间:2014-08 - 2014-12
项目名称:iPad QL Re-DL专案
项目描述:
项目介绍
前期准备:专案人力需求,检验治/工具、检验线体Layout规划。
过程控制:
1,人员检出率检讨。
2,品质异常Highlight及召集相关部门改善,并跟进改善进度。
3,定期与客户Review产品良率及出货达成。
我的职责
项目时间:2014-09 - 2014-12
项目名称:APA & MRC Aus
项目描述:
项目介绍
1.Arrange work schedule as per customer's requirements;
2.Review mill's certificates and quality system management documents;
3.Review equipment valid certificates and calibration certificates of gauges;
4.Review qualifications of personnel;
5.Witness material's test, and Lab test
6.Witnessed repair area for external coating and internal coating
7. Coating of Pipe for 1067X12.27mm external FPE coating and internal painting.
External FBE coating,
8.Arrange work schedule as per customer's requirements;
9.Review mill's certificates and quality system management documents;
10.Review equipment valid certificates and calibration certificates of gauges;
11.Review qualifications of personnel;
12.Witness material's test, and Lab test.
13.Witnessed repair area for external coating and internal coating.
14.Witness truck loading, supervision, control and report of production process;
15.Review MTC and sign;
16.Issue the release note;
17.Write the daily report and Weekly report.
18.Inspection during the coating process and reviewed part records, test reports of coating production, including raw material confirmed, incoming rack inspection, the abrasive blasting, Dust test , Surface cleanliness, Surface profile ,control record of coating Environmental conditions, interval time of blasting and coating , Intermediate frequency heating and powder spray, water cooling, Coating appearance, on line and manual holiday detection test, External FBE thickness of coating, cutback pipe end record of coating, Packing etc.,
19.Witnessed lab test including after 24hours Catholic Disbandment test and hot water soak, Flexibility test, Interface contamination test, Interfacial Porosity test, Cross-section Porosity test.
我的职责
项目时间:2016-01 - 至今
项目名称:Geae/Thor Top Speaker(iPhone 7/7 Plus)
项目描述:
项目介绍
工作描述:
负责Gaea & Thor Top Speaker(为第一代导入新材料音膜的iPhone)过程质量管控以及推动项目良率、质量水平的持续改善。
主要内容:
1、负责项目所有检测测试系统的认证以及报告提交(e.g. MSA G R&R and A R&R etc.);
2、项目客户PPAP相关报告模版的制作以及提交(e.g. 全尺寸数据报告、过程CPK数据、产品性能实验报告 等等);
3、协调相关部门(研发、生产、工艺等)推进项目的持续改善;
4:制作月报、季报、项目总结报告定期向上级领导进行工作汇报;
5、进行IPQC检验的各类培训(QC 7 工具、CTQ、项目流程图 等),保证IPQC对于项目质控点的准确认识,确保产品受控;
主要成绩:
1、OQC PPM从量产初期的 August 3623 To January 346;
2、后道投诉频次从August 25 至 January 1;
3、客户投诉频次 < 0.3 per month;
4、IPQC检验技师率从6.36% 至 28.18%;
5、新部门质量体系的建立以及完善;
我的职责